Lake Road and White Road Water Main Replacement

Overview

The existing water main on Lake Road, between the intersections of White Road and Colby Street and on White Road between the intersection of White Road and Lake Road and #88 White Road will be replaced by a contractor hired by the Water Authority.  As part of this work, the existing hydrants and valves will be replaced.  Service connections will be replaced as necessary.  The new water main will be ductile iron and installed within the right-of-way and within an easement that has been obtained by the Water Authority.  

Once the main has been installed, it is pressure tested for leaks. If any leaks are found, they are corrected. Then the main is flushed and disinfected. Health samples are taken for testing by the Department of Health. After the main has successfully passed all tests, service connections are transferred from the old main to the new main.

During final restoration, disturbed areas are restored to their preconstruction condition. Temporary asphalt is removed, and permanent asphalt is installed in paved areas. Lawn areas are graded and seeded and the contractor is responsible for proper regrowth.

Schedule

The schedule depends on a number of factors, but we anticipate our contractor starting work in the late July, and completing work in November.  Final lawn restoration will be completed in the spring of 2020.  

Questions

You may contact our Customer Service department at (585) 442-7200 weekdays from 8:30 am to 4:30 pm, or our Dispatcher at (585) 442-2009 weekdays before 8:30 and after 4:30 pm, and on weekends and holidays. A Water Authority inspector will be on-site throughout construction. Our inspectors carry an ID card and drive a company vehicle with a Water Authority logo on it. They are happy to answer any questions you may have.

Project Bulletin

Click below for a project bulletin with further information on this project.

Project Info Bulletin

Q: What determines replacement, relocation or relining of water mains?
A: Evaluation is primarily based on pipe age, the occurrence of breaks and repairs, and future hydraulic considerations.

Q: Will our water services need to be repaired?
A: The Water Authority is typically responsible for the portion of each building's water service that is in the public right-of-way or  easement, up to and including the curb stop. The Water Authority will replace its portion of your service line and the curb stop during the project if needed.

Q: What depth are the new pipes buried?
A: Unless there are conflicts with other utilities, the new pipes will be installed approximately 5' deep.

Q: Will I have water service during the project?
A: If the water main that serves your home is being replaced, you will be notified in advance of any non-emergency service outages. Service to homes is temporarily shut down during installation of new service connections to the curb stop and during tie-in connections at the end of the water main installation.

Q: Will there be open trenches at night?
A: No, the site must be left in a safe manner by the contractor and trenches will be protected with orange construction fencing.

Q: Is the contractor penalized if the project is not completed on time?
A: Yes, there are provisions in the contract to ensure the project is completed in a timely manner.

Q: Will damage to my lawn be repaired?
A: Yes, lawn areas are graded and seeded and the contractor is responsible for proper regrowth.